CASE STUDY · MODELLED PLANT · VIETNAM

Avis Company — four LPG boilers in Vietnam, savings booked in VND

The same physical method as the US plant, run on a Vietnamese LPG boiler house and priced in VND. Two condensing stages on the flue gas, feedwater heated to 85 °C, and the fuel saving reported as a share of the fuel bill — the only number that survives an audit.

Plant profile

PlantAvis Company — 4 boilers (SB-01, SB-02, SB-03, SB-04)
Location / gridVietnam · Asia/Ho_Chi_Minh · VND
Capacity25.1 t/h steam across 4 boilers · 18,850 kW installed
FuelLPG (propane/butane) · NCV 45.9 GJ/t · CO2 2.985 kg per kg fuel
Heat recovery unittwo-pass condensing economizer (DXL)
Operating hours8,000 h / year
DataSimulated instrument signals on the plant model — 1-minute samples

Baseline — what the stack was throwing away

The 4 boilers together fire 1,151 kg of fuel an hour and leave the stack between 186.6 °C and 187.3 °C. The flue-gas dew point is 56.1 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C.

BoilerLoadFuelFlue in / outWater in / outHRSaved
SB-0162.4 %111 kg/h187.3 → 50.5 °C29.8 → 45.3 °C109 kW9.85 %
SB-0276.9 %204 kg/h186.6 → 50.2 °C29.8 → 45.5 °C203 kW9.93 %
SB-0382.4 %292 kg/h186.8 → 50.1 °C29.9 → 45.3 °C294 kW9.99 %
SB-0463.1 %544 kg/h187.0 → 50.7 °C29.7 → 45.5 °C529 kW9.74 %

Solution

The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 86.9 %, with the stack margin held at 5.5 °C above the dew point.

Measured results

MetricValueNote
Heat recovered, right now1,136 kWflue side and water side balanced
Fuel not purchased126 kg/h · 9.85 %share of the fuel bill
Condensate collected428 kg/hcounted, not estimated
Boiler efficiency80.1 % → 88.9 % (GCV)before → after
Cost per tonne of steam2,215,384 → 1,997,187 VNDfuel + water
Fuel cost avoided3.8 m VND/hat 30,500 VND/kg

Savings and payback

PeriodFuel not purchasedHeat recoveredMoney savedCO2
Since commissioning47.1 t537.9 MWh1.44 bn VND140.6 t
Per year (8,000 h)1,006 t9,084 MWh30.79 bn VND3,003 t

Water saved is condensate actually collected: 193.4 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.985 kg per kg of fuel.

Verification method

IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The instrument signals are simulated from the boiler nameplate and the heat-recovery unit datasheet, and every number on this page is recomputed live from those signals — no customer and no invoiced saving is claimed.

Heattech Pulse dashboard — Avis Company: 126 kg/h fuel not purchased, 1,136 kW heat recovered, 1.44 bn VND saved since commissioning
Avis Company as it runs in Heattech Pulse — overview, fuel and water not purchased, CO2 avoided.

Open the live plant →