The same physical method as the US plant, run on a Vietnamese LPG boiler house and priced in VND. Two condensing stages on the flue gas, feedwater heated to 85 °C, and the fuel saving reported as a share of the fuel bill — the only number that survives an audit.
| Plant | Avis Company — 4 boilers (SB-01, SB-02, SB-03, SB-04) |
|---|---|
| Location / grid | Vietnam · Asia/Ho_Chi_Minh · VND |
| Capacity | 25.1 t/h steam across 4 boilers · 18,850 kW installed |
| Fuel | LPG (propane/butane) · NCV 45.9 GJ/t · CO2 2.985 kg per kg fuel |
| Heat recovery unit | two-pass condensing economizer (DXL) |
| Operating hours | 8,000 h / year |
| Data | Simulated instrument signals on the plant model — 1-minute samples |
The 4 boilers together fire 1,151 kg of fuel an hour and leave the stack between 186.6 °C and 187.3 °C. The flue-gas dew point is 56.1 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C.
| Boiler | Load | Fuel | Flue in / out | Water in / out | HR | Saved |
|---|---|---|---|---|---|---|
| SB-01 | 62.4 % | 111 kg/h | 187.3 → 50.5 °C | 29.8 → 45.3 °C | 109 kW | 9.85 % |
| SB-02 | 76.9 % | 204 kg/h | 186.6 → 50.2 °C | 29.8 → 45.5 °C | 203 kW | 9.93 % |
| SB-03 | 82.4 % | 292 kg/h | 186.8 → 50.1 °C | 29.9 → 45.3 °C | 294 kW | 9.99 % |
| SB-04 | 63.1 % | 544 kg/h | 187.0 → 50.7 °C | 29.7 → 45.5 °C | 529 kW | 9.74 % |
The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 86.9 %, with the stack margin held at 5.5 °C above the dew point.
| Metric | Value | Note |
|---|---|---|
| Heat recovered, right now | 1,136 kW | flue side and water side balanced |
| Fuel not purchased | 126 kg/h · 9.85 % | share of the fuel bill |
| Condensate collected | 428 kg/h | counted, not estimated |
| Boiler efficiency | 80.1 % → 88.9 % (GCV) | before → after |
| Cost per tonne of steam | 2,215,384 → 1,997,187 VND | fuel + water |
| Fuel cost avoided | 3.8 m VND/h | at 30,500 VND/kg |
| Period | Fuel not purchased | Heat recovered | Money saved | CO2 |
|---|---|---|---|---|
| Since commissioning | 47.1 t | 537.9 MWh | 1.44 bn VND | 140.6 t |
| Per year (8,000 h) | 1,006 t | 9,084 MWh | 30.79 bn VND | 3,003 t |
Water saved is condensate actually collected: 193.4 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.985 kg per kg of fuel.
IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The instrument signals are simulated from the boiler nameplate and the heat-recovery unit datasheet, and every number on this page is recomputed live from those signals — no customer and no invoiced saving is claimed.