Fuel saving 8.47 % measured on our demo plant (Avis Foods) · IPMVP Option B, boundary = boiler + economizer

CXL / DXL datasheet

Heat-recovery modules for industrial steam and hot-water boilers, fired on LPG, natural gas, diesel or HFO. Figures below are the design envelope; the measured performance on a specific plant is published on its own PULSE page.

1. Models — Model selection by duty (our codes, 100 kW steps)

VX- codes are Heattech selection codes, not Cain SKU numbers. Cain sizes each unit per project RFQ; we order by the duty in kW and confirm the final size from measured flue-gas data.

Code CXLCode DXLDuty (kW)Boiler (t/h steam)LPG (kg/h)Flue gas (kg/h)Sensible (kW)Latent (kW)
VX-CXL-0100VX-DXL-01001001.3721.3265248
VX-CXL-0200VX-DXL-02002002.51432.65210496
VX-CXL-0300VX-DXL-03003003.82153.977157143
VX-CXL-0400VX-DXL-04004005.12875.303209191
VX-CXL-0500VX-DXL-05005006.33586.629261239
VX-CXL-0600VX-DXL-06006007.64307.955313287
VX-CXL-0700VX-DXL-07007008.95029.281365335
VX-CXL-0800VX-DXL-080080010.257310.606418382
VX-CXL-0900VX-DXL-090090011.464511.932470430
VX-CXL-1000VX-DXL-1000100012.771713.258522478
VX-CXL-1100VX-DXL-1100110014.078814.584574526
VX-CXL-1200VX-DXL-1200120015.286015.910626574
VX-CXL-1300VX-DXL-1300130016.593217.236679621
VX-CXL-1400VX-DXL-1400140017.8100318.561731669
VX-CXL-1500VX-DXL-1500150019.0107519.887783717
VX-CXL-1600VX-DXL-1600160020.3114721.213835765

nnnn is the duty in kW, zero-padded to four digits (0700 = 700 kW). Both codes exist at the same duty: CXL = single stage, DXL = two stage. Range 100 – 1600 kW (1.3 – 20.3 t/h steam).

Pick the code by duty

VX-CXL-0700 = 700 kW, fits a ~8.9 t/h steam boiler at the assumptions below. CXL if the plant has steady makeup/process water; DXL if makeup is limited or intermittent.

How the table is calculated

  • Steam at 10 bar(a); feedwater 105 °C.
  • Fuel LHV 46,000 kJ/kg; boiler efficiency η = 0.90; excess air λ = 1.15.
  • Flue gas 190 °C in → 55 °C out; cp = 1.05 kJ/kg·K; 60 % of the water vapour condensed.
  • Result: 78.8 kW of recoverable heat per 1 t/h of steam — the single ratio behind every row, so you can re-derive any line yourself.

At these assumptions the theoretical ceiling is 10.9 % of fuel input (all sensible and latent heat recovered). The 8.47 % we publish is the figure measured on our demo plant — a different number, on purpose. Do not mix the two: the ceiling is a calculation, 8.47 % is a measurement.

2. Operating envelope

Flue gas inlet
149 – 427 °C (300 – 800 °F)
Flue gas outlet · CXL and DXL
77 – 49 °C (170 – 120 °F), below the water dew point (54.6 °C) and above the acid dew point
Flue gas flow
up to 250,000 lb/hr (113,000 kg/h)
Heat source
up to 250,000,000 BTU/hr (73 MW)
Feedwater inlet
29.7 – 60 °C
Feedwater outlet
up to 88 °C (set point adjustable)
Flue-side pressure drop
≤ 250 Pa at design flow (measured at commissioning)
Fuel
LPG, natural gas, diesel, HFO (sulphur content governs CXL/DXL eligibility)

3. Materials & instrumentation

4. What is not included

5. Commercial

Equipment and installation are quoted per site, against the saving measured on that site. PULSE subscription is priced per boiler per month — see pricing. No price is published for hardware because a stack that fits a 6 MW boiler does not fit a 1.5 MW one.

Cain DXL two-stage condensing economizer: one casing with two stainless tube bundles and hinged access doors
DXL - two-stage condensing. Stage 1 preheats boiler feedwater, stage 2 preheats makeup water.
Cain CXL single-stage condensing economizer: single casing with stainless coil and condensate drain
CXL - single-stage condensing. Exhaust cooled to 170-120 F (77-49 C); heat goes to makeup or process water.

When each one is the better choice

Both configurations cool the flue gas to the same 77–49 °C (170–120 °F), below the water dew point — that match is the design target, not a coincidence. What differs is where the heat goes and how many hours a year the exchanger actually runs condensing.

CXL (single stage) — when this one is the better choice

  • Fewest connections, one heat sink. All recovered heat goes into a single makeup or process water stream — the simplest piping, the lowest installed cost and the lowest maintenance burden of the two.
  • Your plant already runs a steady, cold makeup or process water flow. That flow is the heat sink, so recovery starts paying from the first hour of operation with no extra water treatment step.
  • Budget is the binding constraint. If the goal is to capture most of the available saving on a limited capital envelope, this is the configuration to price first.
  • Watch out: if makeup water is intermittent or undersized, condensing hours are limited — the exchanger only recovers while cold water is actually flowing.

DXL (two stage) — when this one is the better choice

  • Boiler feedwater flows continuously. Stage 1 always has a heat sink, so the exchanger stays in the condensing range for far more hours per year than a makeup-water-only design.
  • You want the largest total recovered duty. Two stages in series hold a bigger duty without waiting for a makeup-water demand, which matters on large steam plants.
  • Makeup water is limited, uneven, or expensive to treat. DXL does not depend on makeup flow to keep condensing, so recovery survives a variable water balance.
  • Watch out: two stages mean more connections and more control — stage 2 must be controlled so makeup water is not over-preheated.

How to choose: steady makeup or process water plus a tight budget points to CXL; limited or uneven makeup water, or the largest possible total heat recovery, points to DXL. Neither is absolutely better — the plant’s real heat sinks decide. Sizing is done on measured water flows, flue-gas flow and stack temperature, not on a brochure.