CASE STUDY · MODELLED PLANT · VIETNAM

Biomass plant, Vietnam — 20 t/h wood-chip boiler, flue gas 187 °C down to 47 °C

A 20 t/h biomass steam boiler burning wood chips at 30 % moisture, modelled at its nameplate specification and metered inside Heattech Pulse. The two condensing stages take the flue gas from 187 °C to 46.8 °C, heat the boiler feedwater and the cold makeup water, and cut the fuel bill by 14.24 % — with the condensate collected and counted, not estimated.

Plant profile

PlantBiomass Plant VN (20 t/h) — model plant inside Heattech Pulse, tenant demo
Location / gridVietnam · Asia/Ho_Chi_Minh · VND
BoilerBM-01 — biomass steam boiler, 20 t/h, 15,000 kW, 1 unit
FuelBiomass — wood chips, 30 % moisture · NCV 12.5 GJ/t · CO2 1.283 kg per kg fuel
Steam8.5 – 10.2 bar · boiler efficiency 85 % (GCV) at design
Operating hours7,500 h / year
Heat recovery unitDXL — two-stage condensing economizer (Heattech build)
DataSimulated instrument signals on the plant model — 1-minute samples, 4 streams

Baseline — what the stack was throwing away

At 79.8 % load the boiler burns 3,987 kg of wood chips an hour and leaves the stack at 186.9 °C. The flue gas dew point is 56.3 °C, so everything above that temperature is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C — cold enough that the sensible part of the recovery alone is worth more than the latent part on most days.

Baseline pointValueSource
Load79.8 %metered (simulated)
Fuel fired3,987 kg/hmetered
Flue gas in / out186.9 °C / 46.8 °Cmetered
Water in / out29.8 °C / 85 °Cmetered
Flue dew point56.3 °Ccalculated from fuel H and excess air
Boiler efficiency before75.1 % (GCV)measured fuel + steam

Solution — two condensing stages, not one

Stage 1 heats the boiler feedwater from 49.5 °C to 85 °C. Stage 2 takes the cold makeup water from 29.8 °C to 49.5 °C, which is what pulls the flue gas below its dew point and keeps it there. The unit runs a 4 % damper, a circulation pump at 16 m³/h and a 26 m³/h recirculation loop; effectiveness sits at 89.2 %.

StageWater sideFlue gas
Stage 1 — feedwater49.5 → 85 °Chot end
Stage 2 — makeup29.8 → 49.5 °Ccold end, below the 56.3 °C dew point
Whole unit29.8 → 85 °C186.9 → 46.8 °C

Measured results

MetricValueNote
Heat recovered, right now1,675 kWflue-side and water-side balance to −0.04 %
Fuel not purchased662 kg/h · 14.24 %share of the fuel bill
Condensate collected806 kg/h0.195 kg per kg of fuel burned
Boiler efficiency75.1 % → 87.6 % (GCV)87.0 % on LHV
Cost per tonne of steam680,695 → 583,741 VNDfuel + water
Fuel cost avoided1.55 m VND/h2,340 VND/kg wood chips

Savings and payback

PeriodFuel not purchasedHeat recoveredMoney savedCO2
Since commissioning556.4 t1,483.4 MWh1.33 bn VND712.6 t
Per year (7,500 h)4,967 t12,565 MWh11.80 bn VND6,373 t

No carbon price is applied on this plant — the CO2 column is physical avoided CO2 from fuel not burned, at 1.283 kg per kg of wood chips. Water saved is counted as condensate actually collected: 794.6 m³ since commissioning.

Verification method

IPMVP Option B in structure: a defined measurement boundary around boiler + economizer, continuous measurement of fuel mass, flue gas temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The heat balance closes to −0.04 % between flue side and water side, which is the check that the numbers are not being double-counted. Because the plant is a model inside Pulse with simulated instrument signals, nothing here is an invoiced customer saving — it is the arithmetic of this plant's own specification, run continuously and published openly.

Heattech Pulse dashboard for the biomass plant: fuel saving 556 kg/h, water 657 kg/h, heat recovered 1,402 kW right now, 1,483.7 MWh total, 1.33 bn VND saved
The plant as it runs in Heattech Pulse — overview, fuel and water not purchased, CO2 avoided.

Open the live plant →