A 20 t/h biomass steam boiler burning wood chips at 30 % moisture, modelled at its nameplate specification and metered inside Heattech Pulse. The two condensing stages take the flue gas from 187 °C to 46.8 °C, heat the boiler feedwater and the cold makeup water, and cut the fuel bill by 14.24 % — with the condensate collected and counted, not estimated.
| Plant | Biomass Plant VN (20 t/h) — model plant inside Heattech Pulse, tenant demo |
|---|---|
| Location / grid | Vietnam · Asia/Ho_Chi_Minh · VND |
| Boiler | BM-01 — biomass steam boiler, 20 t/h, 15,000 kW, 1 unit |
| Fuel | Biomass — wood chips, 30 % moisture · NCV 12.5 GJ/t · CO2 1.283 kg per kg fuel |
| Steam | 8.5 – 10.2 bar · boiler efficiency 85 % (GCV) at design |
| Operating hours | 7,500 h / year |
| Heat recovery unit | DXL — two-stage condensing economizer (Heattech build) |
| Data | Simulated instrument signals on the plant model — 1-minute samples, 4 streams |
At 79.8 % load the boiler burns 3,987 kg of wood chips an hour and leaves the stack at 186.9 °C. The flue gas dew point is 56.3 °C, so everything above that temperature is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C — cold enough that the sensible part of the recovery alone is worth more than the latent part on most days.
| Baseline point | Value | Source |
|---|---|---|
| Load | 79.8 % | metered (simulated) |
| Fuel fired | 3,987 kg/h | metered |
| Flue gas in / out | 186.9 °C / 46.8 °C | metered |
| Water in / out | 29.8 °C / 85 °C | metered |
| Flue dew point | 56.3 °C | calculated from fuel H and excess air |
| Boiler efficiency before | 75.1 % (GCV) | measured fuel + steam |
Stage 1 heats the boiler feedwater from 49.5 °C to 85 °C. Stage 2 takes the cold makeup water from 29.8 °C to 49.5 °C, which is what pulls the flue gas below its dew point and keeps it there. The unit runs a 4 % damper, a circulation pump at 16 m³/h and a 26 m³/h recirculation loop; effectiveness sits at 89.2 %.
| Stage | Water side | Flue gas |
|---|---|---|
| Stage 1 — feedwater | 49.5 → 85 °C | hot end |
| Stage 2 — makeup | 29.8 → 49.5 °C | cold end, below the 56.3 °C dew point |
| Whole unit | 29.8 → 85 °C | 186.9 → 46.8 °C |
| Metric | Value | Note |
|---|---|---|
| Heat recovered, right now | 1,675 kW | flue-side and water-side balance to −0.04 % |
| Fuel not purchased | 662 kg/h · 14.24 % | share of the fuel bill |
| Condensate collected | 806 kg/h | 0.195 kg per kg of fuel burned |
| Boiler efficiency | 75.1 % → 87.6 % (GCV) | 87.0 % on LHV |
| Cost per tonne of steam | 680,695 → 583,741 VND | fuel + water |
| Fuel cost avoided | 1.55 m VND/h | 2,340 VND/kg wood chips |
| Period | Fuel not purchased | Heat recovered | Money saved | CO2 |
|---|---|---|---|---|
| Since commissioning | 556.4 t | 1,483.4 MWh | 1.33 bn VND | 712.6 t |
| Per year (7,500 h) | 4,967 t | 12,565 MWh | 11.80 bn VND | 6,373 t |
No carbon price is applied on this plant — the CO2 column is physical avoided CO2 from fuel not burned, at 1.283 kg per kg of wood chips. Water saved is counted as condensate actually collected: 794.6 m³ since commissioning.
IPMVP Option B in structure: a defined measurement boundary around boiler + economizer, continuous measurement of fuel mass, flue gas temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The heat balance closes to −0.04 % between flue side and water side, which is the check that the numbers are not being double-counted. Because the plant is a model inside Pulse with simulated instrument signals, nothing here is an invoiced customer saving — it is the arithmetic of this plant's own specification, run continuously and published openly.