A hospital boiler house with three smaller condensing economizers, modelled from Cain Industries' design data: modest unit size, long operating hours, and the same measurement discipline as the larger plants.
| Plant | Regional Hospital (modelled) — 3 boilers (FCR-01, FCR-02, FCR-03) |
|---|---|
| Location / grid | United States · America/Chicago · USD |
| Capacity | 6.8 t/h steam across 3 boilers · 671 kW installed |
| Fuel | Natural gas (CNG) · NCV 47.1 GJ/t · CO2 2.64 kg per kg fuel |
| Heat recovery unit | FCR-1L3816ALS × 3 |
| Operating hours | 8,000 h / year |
| Data | Cain Industries published design data, modelled in Pulse |
The 3 boilers together fire 33 kg of fuel an hour and leave the stack between 203.3 °C and 204.0 °C. The flue-gas dew point is 57.6 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C.
| Boiler | Load | Fuel | Flue in / out | Water in / out | HR | Saved |
|---|---|---|---|---|---|---|
| FCR-01 | 57.1 % | 11 kg/h | 204.0 → 48.0 °C | 29.8 → 43.0 °C | 16 kW | 13.96 % |
| FCR-02 | 51.0 % | 10 kg/h | 203.3 → 47.4 °C | 30.3 → 42.4 °C | 14 kW | 14.19 % |
| FCR-03 | 66.4 % | 13 kg/h | 203.4 → 47.7 °C | 29.6 → 42.7 °C | 18 kW | 14.05 % |
The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 89.5 %, with the stack margin held at 3.0 °C above the dew point.
| Metric | Value | Note |
|---|---|---|
| Heat recovered, right now | 48 kW | flue side and water side balanced |
| Fuel not purchased | 5 kg/h · 14.05 % | share of the fuel bill |
| Condensate collected | 25 kg/h | counted, not estimated |
| Boiler efficiency | 76.7 % → 89.2 % (GCV) | before → after |
| Cost per tonne of steam | 71 → 61 USD | fuel + water |
| Fuel cost avoided | $5/h | at 1 USD/kg |
| Period | Fuel not purchased | Heat recovered | Money saved | CO2 |
|---|---|---|---|---|
| Since commissioning | 13.4 t | 119.0 MWh | $12.7k | 35.3 t |
| Per year (8,000 h) | 44 t | 386 MWh | $42.3k | 115 t |
Water saved is condensate actually collected: 62.3 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.64 kg per kg of fuel.
IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The installation and design data are Cain Industries' own published figures; the percentages, money and efficiency are our model of that design running in Pulse.