CASE STUDY · MODELLED FROM CAIN · UNITED STATES

Regional Hospital — three FCR-1L3816ALS units on a hospital steam plant

A hospital boiler house with three smaller condensing economizers, modelled from Cain Industries' design data: modest unit size, long operating hours, and the same measurement discipline as the larger plants.

Plant profile

PlantRegional Hospital (modelled) — 3 boilers (FCR-01, FCR-02, FCR-03)
Location / gridUnited States · America/Chicago · USD
Capacity6.8 t/h steam across 3 boilers · 671 kW installed
FuelNatural gas (CNG) · NCV 47.1 GJ/t · CO2 2.64 kg per kg fuel
Heat recovery unitFCR-1L3816ALS × 3
Operating hours8,000 h / year
DataCain Industries published design data, modelled in Pulse

Baseline — what the stack was throwing away

The 3 boilers together fire 33 kg of fuel an hour and leave the stack between 203.3 °C and 204.0 °C. The flue-gas dew point is 57.6 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 29.8 °C.

BoilerLoadFuelFlue in / outWater in / outHRSaved
FCR-0157.1 %11 kg/h204.0 → 48.0 °C29.8 → 43.0 °C16 kW13.96 %
FCR-0251.0 %10 kg/h203.3 → 47.4 °C30.3 → 42.4 °C14 kW14.19 %
FCR-0366.4 %13 kg/h203.4 → 47.7 °C29.6 → 42.7 °C18 kW14.05 %

Solution

The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 89.5 %, with the stack margin held at 3.0 °C above the dew point.

Measured results

MetricValueNote
Heat recovered, right now48 kWflue side and water side balanced
Fuel not purchased5 kg/h · 14.05 %share of the fuel bill
Condensate collected25 kg/hcounted, not estimated
Boiler efficiency76.7 % → 89.2 % (GCV)before → after
Cost per tonne of steam71 → 61 USDfuel + water
Fuel cost avoided$5/hat 1 USD/kg

Savings and payback

PeriodFuel not purchasedHeat recoveredMoney savedCO2
Since commissioning13.4 t119.0 MWh$12.7k35.3 t
Per year (8,000 h)44 t386 MWh$42.3k115 t

Water saved is condensate actually collected: 62.3 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.64 kg per kg of fuel.

Verification method

IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The installation and design data are Cain Industries' own published figures; the percentages, money and efficiency are our model of that design running in Pulse.

Heattech Pulse dashboard — Regional Hospital (modelled): 5 kg/h fuel not purchased, 48 kW heat recovered, $12.7k saved since commissioning
Regional Hospital (modelled) as it runs in Heattech Pulse — overview, fuel and water not purchased, CO2 avoided.

Open the live plant →