A published installation by Cain Industries — duty, temperatures and flows are theirs. We re-ran the published inputs through the PULSE method to get the number a case study usually leaves out: how much of the fuel bill it actually is, in US, Vietnamese and metric units.
| Customer | University Campus · California, United States |
|---|---|
| Application | University central plant · steam boilers · retrofit of an existing installation |
| Boilers | 3 × EM-28 · 4,021 HP (3,000 kW) each · 4.64 t/h each · 9,000 kW installed |
| Steam condition | 7 bar(g) · 101.5 psig · saturated steam 170.4 °C / 338.7 °F · 4.64 t/h |
| Recovery equipment | EM-28 × 3 — CHR, condensing heat recovery only, no condensing stage |
| Flue gas | 490 → 300 °F at 1,750 SCFM |
| Heat sink | 30 GPM, +26 °F rise — boiler feedwater |
| Recovered duty (published) | 400,000 BTU/h |
| Source | Cain Industries — published case study |
The campus central plant ran its boilers with no heat recovery on the flue: gas left at 490 °F and went to the stack. Every hour of operation spent fuel to make steam, and part of that fuel went out of the chimney as heat above the water dew point.
The baseline is the published design point — flue gas at 490 °F, 1,750 SCFM, feedwater entering the recovery unit at 30 GPM and leaving 26 °F warmer. Those figures are Cain’s for this installation and we have not altered them.
One central plant: three steam boilers and their common flue path, plus the feedwater loop the recovery unit heats. Fuel in, steam out, flue temperatures in and out of the unit, water in and out.
Three EM-28 heat-recovery units were installed, one per boiler, each taking heat above the water dew point out of the flue gas and putting it into boiler feedwater. Flue gas leaves the boiler at 490 °F and leaves the recovery unit at 300 °F at 1,750 SCFM; the water side runs 30 GPM with a 26 °F rise.
As with the hospital case, this is condensing. The existing sink runs at 160 °F, far above the 131 °F dew point of the flue gas, so a condensing stage on that sink would recover nothing and no condensate or water saving is claimed.
EM-28, three units, one per 4,021 HP boiler. Condensing heat recovery from the flue gas into feedwater.
The sink at 160 °F cannot take the flue below its dew point. On a new build the second stage would need a cold sink — make-up water at about 80 °F — and that is a water-side decision, not an economizer decision.
Seven points on the above-dew-point loop are instrumented: four temperatures — flue gas in, flue gas out, water in on the cold make-up line and water out on the heated feedwater line — plus steam pressure at the boiler, circulating water flow and condensate flow. The four temperatures are the points a real installation needs in order to prove recovery on both the flue side and the water side; the three flows are what shows the unit is actually working rather than merely warm. They are placed on the vendor’s general above-dew-point-heat application P&ID: the catalogue carries no drawing specific to this unit’s model, so the general arrangement is used and no model-specific claim is made.
The readings below are the PULSE demo plant for University Campus — a simulated model of a condensing economizer, refreshed every five seconds from the PULSE data service. They demonstrate the measurement points and the trend; they are not the measured installation reported in the sections above. Circulating water flow and condensate flow have no field instrument in the model — they are derived from the live temperatures and the flue moisture, and the feed publishes them as modelled values. Condensate flow reads zero because the flue leaves far above its dew point: a condensing unit condenses no water, so the zero is physics rather than a missing reading.

The duty and temperatures below are Cain Industries’ published design data for their own installation. We have not re-measured them; what we changed is the arithmetic, expressed here in three unit systems so the same plant cannot be quoted two different ways.
| Quantity | United States | Vietnam | Other (metric) |
|---|---|---|---|
| Recovered duty | 400,000 BTU/h · 0.40 MMBtu/h | 117 kW · 703 MWh/yr | 117 kW · 703 MWh/yr |
| Flue gas temperature | 490 → 300 °F | 254.4 → 148.9 °C | 254.4 → 148.9 °C |
| Annual fuel (as saved) | 30,000 therm | 3,165 GJ · 703 MWh | 2,532 GJ |
| Annual saving | $21,000 | 552,300,000 VND | €19,320 · £16,590 |
| CO₂ avoided | 175.3 short tons | 159.0 tonnes | 159.0 t |
| Recovered duty | 400,000 BTU/h | 117 kW | 117 kW |
A boiler putting out 10,236 MBH at 80 % efficiency burns 12,795,525 BTU/h of fuel. The recovery unit takes 400,000 BTU/h back out of the flue, so the saving is 400,000 / 12,795,525 = 3.13 % of the fuel bill.
At 6,000 running hours a year that is 30,000 therm, and at $0.70/therm it is $21,000 a year. Cain publish a saving of $13,924/yr for the same installation, which implies about 3,978 running hours a year at that gas price; again the difference is run-hours, not efficiency. On an installed cost of $9,962 the modelled payback is 5.7 months.
Adding a cold sink (make-up water at about 80 °F) would let the flue be taken below its 131 °F dew point. The flue holds 1,596,382 BTU/h (12.48 % of fuel) below that point, the sink could absorb 600,000 BTU/h (4.69 % of fuel) at 30 GPM with a 40 °F rise, and taking it all would need 80 GPM. Combined, the two-stage logic would reach 3.13 % + 4.69 % = 7.82 % of fuel — the same pattern our own demo plant reports as 5.92 % + 2.55 % (decomposition of the measured 8.47 %). Those numbers are modelled from published design data, not metered.
This is a manufacturer-published installation, not a site we instrumented. Duty, temperatures, flows and the published payback are Cain Industries’ figures for their own customer; we re-ran the inputs through the PULSE model and state every assumption so the arithmetic can be checked.
The same inputs are seeded as a modelled site in PULSE (p_cain_csulb), where the application’s own efficiency calculation returns 5.32 % on the first boiler — the number on this page is reproducible in the product, not just in a spreadsheet.
On a real project the design duty is replaced by meters: fuel, gas temperature before and after the unit, water in and out, and condensate mass flow where a condensing stage exists. That is what turns a design figure into a re-derivable saving under the M&V protocol.

What this document is. A published installation by Cain Industries, re-modelled by Heattech. The customer is Cain’s customer, not ours, and the plant is not instrumented by us. Design data is theirs; the percentages, the money and the condensing case are our model, stated with their assumptions so anyone can redo the arithmetic.