CASE STUDY · MODELLED FROM CAIN · UNITED STATES

University Campus — three EM-28 condensing economizers on a campus steam plant

Cain Industries' published installation data for a university campus, re-run through Heattech Pulse: three EM-28 units on CNG boilers at 6.5–8.2 bar, with the savings and the efficiency recomputed from the design data instead of quoted from a brochure.

Plant profile

PlantUniversity Campus (modelled) — 3 boilers (EM-28A, EM-28B, EM-28C)
Location / gridUnited States · America/Los_Angeles · USD
Capacity13.9 t/h steam across 3 boilers · 9,000 kW installed
FuelNatural gas (CNG) · NCV 47.1 GJ/t · CO2 2.64 kg per kg fuel
Heat recovery unitEM-28 condensing economizer × 3
Operating hours8,000 h / year
DataCain Industries published design data, modelled in Pulse

Baseline — what the stack was throwing away

The 3 boilers together fire 446 kg of fuel an hour and leave the stack between 238.1 °C and 238.5 °C. The flue-gas dew point is 57.6 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 30.4 °C.

BoilerLoadFuelFlue in / outWater in / outHRSaved
EM-28A64.2 %164 kg/h238.5 → 47.4 °C30.4 → 42.4 °C275 kW16.14 %
EM-28B55.6 %142 kg/h238.3 → 47.0 °C30.1 → 42.0 °C241 kW16.26 %
EM-28C54.8 %140 kg/h238.1 → 47.2 °C29.7 → 42.2 °C236 kW16.23 %

Solution

The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 91.8 %, with the stack margin held at 2.4 °C above the dew point.

Measured results

MetricValueNote
Heat recovered, right now752 kWflue side and water side balanced
Fuel not purchased86 kg/h · 16.21 %share of the fuel bill
Condensate collected350 kg/hcounted, not estimated
Boiler efficiency75.0 % → 89.5 % (GCV)before → after
Cost per tonne of steam72 → 61 USDfuel + water
Fuel cost avoided$83/hat 1 USD/kg

Savings and payback

PeriodFuel not purchasedHeat recoveredMoney savedCO2
Since commissioning196.7 t1,728.1 MWh$186.9k519.4 t
Per year (8,000 h)691 t6,017 MWh$667.4k1,823 t

Water saved is condensate actually collected: 788.6 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.64 kg per kg of fuel.

Verification method

IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The installation and design data are Cain Industries' own published figures; the percentages, money and efficiency are our model of that design running in Pulse.

Heattech Pulse dashboard — University Campus (modelled): 86 kg/h fuel not purchased, 752 kW heat recovered, $186.9k saved since commissioning
University Campus (modelled) as it runs in Heattech Pulse — overview, fuel and water not purchased, CO2 avoided.