Cain Industries' published installation data for a university campus, re-run through Heattech Pulse: three EM-28 units on CNG boilers at 6.5–8.2 bar, with the savings and the efficiency recomputed from the design data instead of quoted from a brochure.
| Plant | University Campus (modelled) — 3 boilers (EM-28A, EM-28B, EM-28C) |
|---|---|
| Location / grid | United States · America/Los_Angeles · USD |
| Capacity | 13.9 t/h steam across 3 boilers · 9,000 kW installed |
| Fuel | Natural gas (CNG) · NCV 47.1 GJ/t · CO2 2.64 kg per kg fuel |
| Heat recovery unit | EM-28 condensing economizer × 3 |
| Operating hours | 8,000 h / year |
| Data | Cain Industries published design data, modelled in Pulse |
The 3 boilers together fire 446 kg of fuel an hour and leave the stack between 238.1 °C and 238.5 °C. The flue-gas dew point is 57.6 °C, so everything above it is heat the plant paid for and did not use. Feedwater arrives at 30.4 °C.
| Boiler | Load | Fuel | Flue in / out | Water in / out | HR | Saved |
|---|---|---|---|---|---|---|
| EM-28A | 64.2 % | 164 kg/h | 238.5 → 47.4 °C | 30.4 → 42.4 °C | 275 kW | 16.14 % |
| EM-28B | 55.6 % | 142 kg/h | 238.3 → 47.0 °C | 30.1 → 42.0 °C | 241 kW | 16.26 % |
| EM-28C | 54.8 % | 140 kg/h | 238.1 → 47.2 °C | 29.7 → 42.2 °C | 236 kW | 16.23 % |
The condensing stage sits after the boiler and before the stack: flue gas passes the tube bundle, water passes the other side, and the unit is controlled to keep the stack above its minimum while still condensing. Effectiveness at this load is 91.8 %, with the stack margin held at 2.4 °C above the dew point.
| Metric | Value | Note |
|---|---|---|
| Heat recovered, right now | 752 kW | flue side and water side balanced |
| Fuel not purchased | 86 kg/h · 16.21 % | share of the fuel bill |
| Condensate collected | 350 kg/h | counted, not estimated |
| Boiler efficiency | 75.0 % → 89.5 % (GCV) | before → after |
| Cost per tonne of steam | 72 → 61 USD | fuel + water |
| Fuel cost avoided | $83/h | at 1 USD/kg |
| Period | Fuel not purchased | Heat recovered | Money saved | CO2 |
|---|---|---|---|---|
| Since commissioning | 196.7 t | 1,728.1 MWh | $186.9k | 519.4 t |
| Per year (8,000 h) | 691 t | 6,017 MWh | $667.4k | 1,823 t |
Water saved is condensate actually collected: 788.6 m3 since commissioning. No carbon price is added unless stated — the CO2 column is physical avoided CO2 at 2.64 kg per kg of fuel.
IPMVP Option B in structure: a measurement boundary drawn around boiler and economizer, continuous measurement of fuel, flue temperature and water flow/temperature, and savings computed from the measured heat recovery rather than from a design curve. The installation and design data are Cain Industries' own published figures; the percentages, money and efficiency are our model of that design running in Pulse.