A condensing boiler and a condensing economizer are both limited by the same thing: the temperature of the water coming back. Raise the return and the latent-heat recovery disappears without a single alarm.
Published 17 November 2026 · about 6 minutes · sources listed at the end · Heattech is a system integrator: the equipment belongs to the manufacturers cited, the integration and the measurement are ours.
Latent heat only arrives when the flue gas drops below its dew point, and the gas can only be cooled to something above the water temperature on the other side of the metal. So the return water temperature sets the floor. Return at 40 °C makes condensing possible; return at 65 °C makes the same equipment look like a very expensive plain economizer.
Manufacturers publish condensing limits for exactly this reason (Hexonic economizers, Cain Industries), and the numbers in their literature are water-side numbers, not flue-side ones.
Returns drift for ordinary reasons: a three-way valve left in bypass, terminal units resized during a fit-out, a domestic hot-water calorifier demanding a higher storage temperature, or a control schedule set for comfort with no thought for efficiency. None of these look like a heat-recovery fault, and all of them remove the saving.
This is the case for putting a temperature sensor on the return as part of the metering package, not as an afterthought. A rising return is a maintenance signal, and it is cheaper to see it on a chart than to discover it in next year's gas bill.
On the demo plants we report the two stages separately for this reason: 5.92 % from heat above the water dew point and 2.55 % from latent heat, with the water temperature that produced the second number visible next to it.
Three questions separate a real proposal from a brochure: what return temperature did you assume, what happens to the saving if it is 10 °C higher, and how will we know from the data that the second stage is actually condensing? If the answers are a design figure, a shrug, and "the dashboard will show it", the proposal is not finished.
Manufacturer and standards documentation behind the numbers in this article. We are a system integrator: the equipment belongs to the manufacturers named here, the integration and the measurement are ours.