The subscription is agreed in the contract, not sold on a card. Equipment and installation are quoted per site against the saving we measure there — so the payback is documented before you sign. For customers in Vietnam the engagement runs as a signed contract with a VAT invoice, a trial period agreed per site, and payment by bank transfer. Nothing is charged online.
Viet Nam Heat Technology Solution Co., Ltd (VN HEATTECH) · Tax code 0201575632 · No. 31, alley 15/1 Ta Quang Buu, Bach Mai, Hanoi · sales@heattechs.com
Heattech Pulse, Heattech CT, CHR and CHR are engineered against your flue, your fuel and your steam load, so they carry a project price rather than a list price. The quote is built in this order:
| Step | What we do | What you receive |
|---|---|---|
| Survey | Flue temperatures, O₂, fuel and steam baseline, space for the bundle | Measured baseline and a go / no-go on recovery |
| Model | Stage sizing at your load profile, materials, drain route | Predicted saving per stage, with uncertainty stated |
| Quote | Hardware, installation, commissioning, PULSE | One number, and the payback that follows from it |
| Verify | First 30 days of measured operation | Actual saving against predicted — in writing |
No price is quoted for hardware before the survey. A vendor that quotes a percentage for a plant it has never seen is guessing.